Optional upgrade
Level 2
Explore additional finish, lighting and appliance combinations at your design meeting. Selections and upgrade pricing are confirmed separately.
Explore this level →To be built on your lot
Central Florida · Brightview Homes
Starting in Brevard County, with fee allowances included.
Book a meeting
Illustrative model exterior; elevation and finishes may vary.
Brightview Sales Team
Home-site availability · Pricing · Designs
(407) 543-1739Sales Center
480 North Orlando Ave, Suite 236
Winter Park, Florida 32789
Kensington has 4 bedrooms, 3 baths and a 2-car garage across 1 floor. Selected Model 10 configuration includes a gen-suite bedroom with a separate sitting room.
Selected Model 10 configuration includes a gen-suite bedroom with a separate sitting room.
Know what comes included
Explore the finishes, lighting and appliances included with this home. Optional upgrades are identified separately.
Brightview Included Collection · Designer Appointed Features
Download PDFThe Brightview Included Collection
Coordinated finishes and clear included specifications. Builder-supplied illustrations describe the scope; exact supplier selections follow each home’s schedule.
Illustrative standard configuration; final construction drawings govern.
| County | House | Included impact-fee allowance | Other included fees | Advertised total from |
|---|---|---|---|---|
| Brevard | $269,990 | $10,428 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Brevard County; Verification pending: Brevard County Utility Services; No permit fee schedule on file for Brevard — building permit / plan review not in this quote yet. | $4,160 | $284,578 |
| Flagler | $269,990 | $9,310 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Flagler County; Verification pending: City of Palm Coast Utility Department; No permit fee schedule on file for Flagler — building permit / plan review not in this quote yet. | $13,139 | $292,439 |
| Lake | $269,990 | $17,771 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Lake County; No permit fee schedule on file for Lake — building permit / plan review not in this quote yet. | $0 | $287,761 |
| Orange | $269,990 | $29,015 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Orange County Utilities | $8,940 | $307,945 |
| Osceola | $269,990 | $39,981 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Osceola County; Verification pending: Toho Water Authority; No permit fee schedule on file for Osceola — building permit / plan review not in this quote yet. | $13,073 | $323,044 |
| Polk | $269,990 | $19,109 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Polk County; Verification pending: Polk County Utilities; No permit fee schedule on file for Polk — building permit / plan review not in this quote yet. | $10,062 | $299,161 |
| Seminole | $269,990 | $13,362 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Seminole County; Verification pending: Seminole County Utilities (Environmental Services); No permit fee schedule on file for Seminole — building permit / plan review not in this quote yet. | $6,870 | $290,222 |
| Volusia | $269,990 | $15,032 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Volusia County; Verification pending: Volusia County Water Resources & Utility Services; No permit fee schedule on file for Volusia — building permit / plan review not in this quote yet. | $6,044 | $291,066 |
The listed impact fees and separate reserve are already inside the total; they are not added again.
Your detailed lot-specific estimate begins after the signed preconstruction agreement and required first payment.
Pricing snapshot 2026-11-20. We review pricing data monthly. Includes the house and estimated impact fees, reserve, permit fees and public water/sewer connection fees for the unincorporated county scenario, without impact credits. Excludes land, site work beyond listed allowances, well/septic and upgrades. City and utility-provider charges can differ; we confirm your parcel-specific budget before contract.
Your lot, your budget
Public connection allowances use the applicable published county/provider tap and connection fees. They are not a septic-system budget.
Detailed lot-specific estimating begins with the signed preconstruction agreement and required first payment.
Make it yours
We offer multiple designer packages. Preview Levels 2 and 3, then explore the options with our team.
Book a design meeting| Great Room | 19'4" x 16'4" |
|---|---|
| Primary Suite | 12'4" x 14'4" |
| Bedroom 2 | 11'0" x 11'6" |
| Bedroom 3 | 12'6" x 10'8" |
| Gen Suite Bedroom | 12'6" x 10'4" |
| Sitting Room | 13'8" x 10'2" |
| 2-Car Garage | 19'4" x 21'4" |
| Lanai | 13'4" x 10'8" |
Model 10 Left / Wren A1 / 03-26-26 / gen suite · printed room pairs.
Plan and room specifications PDF