Optional upgrade
Level 2
Explore additional finish, lighting and appliance combinations at your design meeting. Selections and upgrade pricing are confirmed separately.
Explore this level →To be built on your lot
Central Florida · Brightview Homes
Starting in Brevard County, with fee allowances included.
Book a meeting
Illustrative model exterior; elevation and finishes may vary.
Brightview Sales Team
Home-site availability · Pricing · Designs
(407) 543-1739Sales Center
480 North Orlando Ave, Suite 236
Winter Park, Florida 32789
Wellington Estate has 4 bedrooms, 3.5 baths and a 2-car garage across 2 floors. Elevation D includes a first-floor study and game room, with the primary suite and loft upstairs.
Elevation D includes a first-floor study and game room, with the primary suite and loft upstairs.
Know what comes included
Explore the finishes, lighting and appliances included with this home. Optional upgrades are identified separately.
Brightview Included Collection · Designer Appointed Features
Download PDFThe Brightview Included Collection
Coordinated finishes and clear included specifications. Builder-supplied illustrations describe the scope; exact supplier selections follow each home’s schedule.
Illustrative standard configuration; final construction drawings govern.
| County | House | Included impact-fee allowance | Other included fees | Advertised total from |
|---|---|---|---|---|
| Brevard | $509,990 | $10,428 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Brevard County; Verification pending: Brevard County Utility Services; No permit fee schedule on file for Brevard — building permit / plan review not in this quote yet. | $4,160 | $524,578 |
| Flagler | $509,990 | $9,310 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Flagler County; Verification pending: City of Palm Coast Utility Department; No permit fee schedule on file for Flagler — building permit / plan review not in this quote yet. | $13,139 | $532,439 |
| Lake | $509,990 | $18,456 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Lake County; No permit fee schedule on file for Lake — building permit / plan review not in this quote yet. | $0 | $528,446 |
| Orange | $509,990 | $31,667 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Orange County Utilities | $8,940 | $550,597 |
| Osceola | $509,990 | $39,981 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Osceola County; Verification pending: Toho Water Authority; No permit fee schedule on file for Osceola — building permit / plan review not in this quote yet. | $13,073 | $563,044 |
| Polk | $509,990 | $19,109 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Polk County; Verification pending: Polk County Utilities; No permit fee schedule on file for Polk — building permit / plan review not in this quote yet. | $10,062 | $539,161 |
| Seminole | $509,990 | $14,454 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Seminole County; Verification pending: Seminole County Utilities (Environmental Services); No permit fee schedule on file for Seminole — building permit / plan review not in this quote yet. | $6,870 | $531,314 |
| Volusia | $509,990 | $16,099 Fees already included in the total
Last source pull: date not recorded.
Items to confirm: Verification pending: Volusia County; Verification pending: Volusia County Water Resources & Utility Services; No permit fee schedule on file for Volusia — building permit / plan review not in this quote yet. | $6,044 | $532,133 |
The listed impact fees and separate reserve are already inside the total; they are not added again.
Your detailed lot-specific estimate begins after the signed preconstruction agreement and required first payment.
Pricing snapshot 2026-11-20. We review pricing data monthly. Includes the house and estimated impact fees, reserve, permit fees and public water/sewer connection fees for the unincorporated county scenario, without impact credits. Excludes land, site work beyond listed allowances, well/septic and upgrades. City and utility-provider charges can differ; we confirm your parcel-specific budget before contract.
Your lot, your budget
Public connection allowances use the applicable published county/provider tap and connection fees. They are not a septic-system budget.
Detailed lot-specific estimating begins with the signed preconstruction agreement and required first payment.
Make it yours
We offer multiple designer packages. Preview Levels 2 and 3, then explore the options with our team.
Book a design meeting| Living Room - First Floor | 15'2" x 15'2" |
|---|---|
| Game Room - First Floor | 20'2" x 10'0" |
| Dining - First Floor | 12'10" x 13'0" |
| Study - First Floor | 12'0" x 12'0" |
| Primary Suite - Second Floor | 13'0" x 18'4" |
| Bedroom 2 - Second Floor | 11'10" x 12'2" |
| Bedroom 3 - Second Floor | 15'8" x 13'2" |
| Bedroom 4 - Second Floor | 13'10" x 10'4" |
| Loft - Second Floor | 11'3" x 9'0" |
| 2-Car Garage | 19'10" x 21'0" |
Model 8 / Elevation D / 08-18-26 / A1 + A2 · printed room pairs.
Plan and room specifications PDF