How to demolish a house in Flagler Beach, FL
In Flagler Beach, residential demolition permits are issued by the City of Flagler Beach Building Department (application: Demolition Permit Checklist and Building Permit Application (packet dated 06/16/2025)).

Demolition permit steps in Flagler Beach
Step 1
Have a state licensed pest control company inspect and sign the Rodent Control Certificate before submitting (not required for burn outs).
Step 2
Sign the Certification of Service Disconnect; the city Utility Billing Department processes the disconnect and the Chief Building Official confirms all utilities are disconnected.
Step 3
File the FDEP asbestos notification (postmarked 10 working days before the project start per the FDEP form in the packet).
Step 4
Record the Notice of Commencement if labor and materials exceed $5,000.
Step 5
Submit the application, proof of ownership, survey and the forms above.
Step 6
Obtain all required inspections including the final inspection.
Documents Flagler Beach asks for
| Document | What it is |
|---|---|
| Permit Application | Notarized; lists dumpster company (roll-off collectors need a city license under Code Sec. 11-17). [2] |
| Proof of property ownership | Copy of recorded warranty deed or Property Appraiser printout. [2] |
| Owner Builder Disclosure Statement | If owner is acting as own contractor. [2] |
| Notice of Commencement | When labor and materials exceed $5,000; recorded and certified by the Flagler County Clerk of Court. [2] |
| Survey | Showing existing structures; indicate if a new structure will be built on the site. [2] |
| Certification of Service Disconnect | Signed by the Utilities Manager. [2] |
| Asbestos Notification Statement | Contact Asbestos Compliance, FDEP, 904-256-1566. [2] |
| Rodent Control Certificate | From a Florida certified pest control operator; not required for burn outs. [2] |
Utilities, asbestos, septic and trees in Flagler Beach
The office that issues it
State rules apply on top of the local ones
The asbestos notice, septic and well abandonment, owner-builder limits and the Notice of Commencement come from state law. See the Florida rules that apply to every demolition.
Straight answers
Do I need a permit to demolish a house in Flagler Beach?
Yes. Residential demolition in Flagler Beach is permitted through the City of Flagler Beach Building Department.
Who can pull a demolition permit in Flagler Beach?
Licensed contractor (must sign the application; contractors must be current with Flagler County Building Services) or owner-builder with the notarized Owner Builder Disclosure Statement (s. 489.103(7), F.S.).
Do I need an asbestos survey to demolish a house in Flagler Beach?
Asbestos Notification Statement is on the city demolition checklist; the packet includes FDEP Form 62-257.900(1), which says the notice must be postmarked 10 working days before the project start.
Can Brightview handle the demolition in Flagler Beach?
Yes. Brightview Homes (CRC1334100) pulls the permit under its Florida contractor license and runs the asbestos survey and notice, utility disconnects, historic documentation when it applies, tear-down, haul-off and final inspection. Demolition is quoted per job, typically $12,000 to $24,000.
Where this comes from
Every fact on this page comes from the official sources below, read on the date shown. Rules change; the building department has the final word.
- Flagler Beach Permits and Forms
https://www.cityofflaglerbeach.com/184/Permits-Forms - Flagler Beach Demolition Permit Application packet (06/16/2025, scanned; read by OCR)
https://www.cityofflaglerbeach.com/DocumentCenter/View/6390/Demolition-Permit-Application-06162025 - Flagler Beach Building Permit Fee Schedule effective 07.01.2026 (scanned)
https://www.cityofflaglerbeach.com/DocumentCenter/View/7341/Building-Permit-Fee-Schedule-Effective-07012026-posted-070226 - FDEP Homeowner's Guide to the CCCL Program
https://floridadep.gov/sites/default/files/Homeowner's%20Guide%20to%20the%20CCCL%20Program%206_2012%20(002)_0.pdf - https://flagler.floridahealth.gov/programs-and-services/environmental-public-health/onsite-sewage-disposal/
https://flagler.floridahealth.gov/programs-and-services/environmental-public-health/onsite-sewage-disposal/
What we could not confirm in published sources
Ask the building department about these before you plan around them.
- Demolition permit fee (fee schedule is a scanned image; no demolition line was legible).
- Whether Flagler Beach has any historic preservation review for demolition (none found).
- Tree removal permit rules.
- Whether demolition alone seaward of the CCCL needs an FDEP CCCL permit.
Get this scope quoted in Flagler County
Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.
Prefer Spanish? Our team works with you in English or Spanish, from the county board to the permit counter.
- Residential Demolition
