How to demolish a house in Apopka, FL
In Apopka, residential demolition permits are issued by the City of Apopka Building Division. If the house is a designated landmark or sits in a local historic district, review by the Historic preservation board (referenced in Apopka LDC s. 3.8.6; exact board name not confirmed) comes first.

If the house is historic in Apopka
Who reviews it: Historic preservation board (referenced in Apopka LDC s. 3.8.6; exact board name not confirmed).
When it applies
- Individually listed places on the Apopka local register of historic places and properties in an H-O Historic Overlay district (LDC s. 3.8.6.B). The code's list of individually listed places is blank on Municode.
How the review works
- Nominations to the local register go to the historic preservation board, which recommends to the Planning Commission; listing then proceeds as a text or map amendment (s. 3.8.6.C).
Sources: [1]
Utilities, asbestos, septic and trees in Apopka
The office that issues it
State rules apply on top of the local ones
The asbestos notice, septic and well abandonment, owner-builder limits and the Notice of Commencement come from state law. See the Florida rules that apply to every demolition.
Straight answers
Do I need a permit to demolish a house in Apopka?
Yes. Residential demolition in Apopka is permitted through the City of Apopka Building Division.
What if my house is historic in Apopka?
If the house is a local landmark or in a local historic district, Historic preservation board (referenced in Apopka LDC s. 3.8.6; exact board name not confirmed) reviews the demolition before a permit can issue.
Do I need an asbestos survey to demolish a house in Apopka?
Orange County is one of eight FDEP local asbestos programs. County EPD guidance: essentially all buildings are subject to the asbestos NESHAP except some single-family residences; single-family homes that will be burned, were used as a business, or are part of a larger project with other houses or businesses on the same site are subject. Call EPD at 407-836-1400 before relying on the residential building exemption. Subject buildings must be thoroughly inspected (generally a survey by a Florida licensed asbestos consultant), a Notice of Demolition or Asbestos Renovation is required even if no asbestos is found, RACM must be abated by a licensed asbestos contractor before demolition, and notices are due at least 10 working days before work starts. see the Florida rules on our residential demolition page for the state rule.
Can Brightview handle the demolition in Apopka?
Yes. Brightview Homes (CRC1334100) pulls the permit under its Florida contractor license and runs the asbestos survey and notice, utility disconnects, historic documentation when it applies, tear-down, haul-off and final inspection. Demolition is quoted per job, typically $12,000 to $24,000.
Where this comes from
Every fact on this page comes from the official sources below, read on the date shown. Rules change; the building department has the final word.
- Apopka LDC s. 3.8.6, H-O Historic Overlay District
https://library.municode.com/fl/apopka/codes/code_of_ordinances?nodeId=PTIIILADECO_ART3ZODI_S3.8OVDI_3.8.6HIOVDI - https://ocfl.net/Portals/0/resource library/permits - licenses/Pre Demolition Packet-CERT.pdf
https://ocfl.net/Portals/0/resource library/permits - licenses/Pre Demolition Packet-CERT.pdf - https://www.apopka.net/222/Building-Division
https://www.apopka.net/222/Building-Division
What we could not confirm in published sources
Ask the building department about these before you plan around them.
- apopka.net returned a Cloudflare 525 error on 2026-10-12, so the Building Division demolition requirements, forms (including a Certification of Service Disconnect †), phone and address could not be read on the primary page.
- Whether any property is actually on the Apopka local register or in an H-O district.
- Whether a demolition review applies to H-O properties despite no procedure in s. 3.8.6.
Get this scope quoted in Orange County
Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.
Prefer Spanish? Our team works with you in English or Spanish, from the county board to the permit counter.
- Residential Demolition
