Demolition permit guide · Orange County

How to demolish a house in Maitland, FL

In Maitland, residential demolition permits are issued by the City of Maitland Building Division (application: Stand-alone Demolition permit with the Demolition Permit Checklist (rev. 1/18/2024)).

Verified 2026-10-12 from 4 official sources
Residential lot
CRC13341008 Central Florida counties480 N Orlando Ave, Suite 236, Winter Park, FL 32789(407) 543-1739
The process

Demolition permit steps in Maitland

  1. Step 1

    Submit the demolition application and checklist online.

  2. Step 2

    Sufficiency review by staff.

  3. Step 3

    Plan review for local, state and federal compliance.

  4. Step 4

    Pay invoiced fees; permit issues.

  5. Step 5

    Contractor disconnects utilities and preps the site; pre-demolition inspection.

  6. Step 6

    After demolition and debris removal, final inspection.

What to submit

Documents Maitland asks for

DocumentWhat it is
Owner matchOwner must match the Orange County Property Appraiser record or provide a warranty deed. [1]
Signed Demolition Permit Sufficiency Checklist [1]
Limited Power of AttorneyNotarized, when a contractor or agent applies for the owner. [1]
Recorded Notice of CommencementIf value is over $5,000, before first inspection. [1]
Demolition planScope shown on drawings, all buildings to be removed. [1]
FDEP Notice of Demolition or Asbestos Renovation copy [1]
Rodent Control CertificateFrom a Florida-certified pest control operator. [1]
Before the machine shows up

Utilities, asbestos, septic and trees in Maitland

Utilities
  • Water, sewer, electric, gas, phone, other: Pre-demolition checklist marks each existing utility requiring disconnect. [1]
Asbestos

Orange County Environmental Protection Division (local FDEP asbestos program): Maitland checklist: contact Orange County EPD (407-836-1400) before demolition for demolition and asbestos notification requirements; submit a copy of the FDEP notice. Orange County is one of eight FDEP local asbestos programs. County EPD guidance: essentially all buildings are subject to the asbestos NESHAP except some single-family residences; single-family homes that will be burned, were used as a business, or are part of a larger project with other houses or businesses on the same site are subject. Call EPD at 407-836-1400 before relying on the residential building exemption. Subject buildings must be thoroughly inspected (generally a survey by a Florida licensed asbestos consultant), a Notice of Demolition or Asbestos Renovation is required even if no asbestos is found, RACM must be abated by a licensed asbestos contractor before demolition, and notices are due at least 10 working days before work starts. see the Florida rules on our residential demolition page for the state rule. [1]

Septic and well

Florida Department of Health in Orange County: If the property has a septic tank or grease trap, contact the Health Department (407-858-1497 ext. 2282 or 2289) before demolition for filling and removal requirements. [1]

Trees

A tree removal permit is required if trees are removed; erosion and sediment control and tree protection installed before demolition. [1]

After the house is down
  • Final inspection after demolition and debris removal.
Good to know
  • Maitland Fire Department sometimes uses buildings slated for demolition for training (Division Chief of Training 407-539-6225).
  • A Municode search of the Maitland Code of Ordinances and Land Development Code found no historic preservation board or demolition review; LDC s.
Where to file

The office that issues it

Who may apply: Contractor with current license, insurance and BTR, or an owner-builder with a notarized Owner Builder Affidavit. A contractor or agent needs a notarized Limited Power of Attorney signed with the owner.

Fee: Invoiced after plan approval.

Florida rules

State rules apply on top of the local ones

The asbestos notice, septic and well abandonment, owner-builder limits and the Notice of Commencement come from state law. See the Florida rules that apply to every demolition.

Questions people actually ask

Straight answers

Do I need a permit to demolish a house in Maitland?

Yes. Residential demolition in Maitland is permitted through the City of Maitland Building Division. Fee: Invoiced after plan approval..

Who can pull a demolition permit in Maitland?

Contractor with current license, insurance and BTR, or an owner-builder with a notarized Owner Builder Affidavit. A contractor or agent needs a notarized Limited Power of Attorney signed with the owner.

Do I need an asbestos survey to demolish a house in Maitland?

Maitland checklist: contact Orange County EPD (407-836-1400) before demolition for demolition and asbestos notification requirements; submit a copy of the FDEP notice. Orange County is one of eight FDEP local asbestos programs. County EPD guidance: essentially all buildings are subject to the asbestos NESHAP except some single-family residences; single-family homes that will be burned, were used as a business, or are part of a larger project with other houses or businesses on the same site are subject. Call EPD at 407-836-1400 before relying on the residential building exemption. Subject buildings must be thoroughly inspected (generally a survey by a Florida licensed asbestos consultant), a Notice of Demolition or Asbestos Renovation is required even if no asbestos is found, RACM must be abated by a licensed asbestos contractor before demolition, and notices are due at least 10 working days before work starts. see the Florida rules on our residential demolition page for the state rule.

Can Brightview handle the demolition in Maitland?

Yes. Brightview Homes (CRC1334100) pulls the permit under its Florida contractor license and runs the asbestos survey and notice, utility disconnects, historic documentation when it applies, tear-down, haul-off and final inspection. Demolition is quoted per job, typically $12,000 to $24,000.

Sources · verified 2026-10-12

Where this comes from

Every fact on this page comes from the official sources below, read on the date shown. Rules change; the building department has the final word.

  1. City of Maitland Demolition Permit Checklist rev. 1/18/2024
    https://www.itsmymaitland.com/DocumentCenter/View/709
  2. https://library.municode.com/fl/maitland/codes/land_development_code
    https://library.municode.com/fl/maitland/codes/land_development_code
  3. https://www.itsmymaitland.com/174/Building-Safety-and-Permitting
    https://www.itsmymaitland.com/174/Building-Safety-and-Permitting
  4. https://maitlandfl-energovpub.tylerhost.net/Apps/SelfService
    https://maitlandfl-energovpub.tylerhost.net/Apps/SelfService

What we could not confirm in published sources

Ask the building department about these before you plan around them.

  • Whether the CHA-O overlay (LDC s. 3.6.5) imposes any demolition review.
  • Building Division street address.
Start here

Get this scope quoted in Orange County

Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.

Prefer Spanish? Our team works with you in English or Spanish, from the county board to the permit counter.

Selected scope
  • Residential Demolition
What is the plan? *