How to demolish a house in Altamonte Springs, FL
In Altamonte Springs, residential demolition permits are issued by the Altamonte Springs Building and Fire Safety Department (application: Demolition / Building Relocation Permit Application (rev. 05/04/2020)).

Demolition permit steps in Altamonte Springs
Step 1
Submit the application with site plans, asbestos notification and contract.
Step 2
Utility cap-off inspection before demolition.
Step 3
Contractor schedules an on-site preconstruction meeting with Code Compliance and Engineering at least 48 hours before demolition (407-571-8343).
Utilities, asbestos, septic and trees in Altamonte Springs
The office that issues it
State rules apply on top of the local ones
The asbestos notice, septic and well abandonment, owner-builder limits and the Notice of Commencement come from state law. See the Florida rules that apply to every demolition.
Straight answers
Do I need a permit to demolish a house in Altamonte Springs?
Yes. Residential demolition in Altamonte Springs is permitted through the Altamonte Springs Building and Fire Safety Department. Fee: Based on job valuation (copy of contract required)..
Do I need an asbestos survey to demolish a house in Altamonte Springs?
Altamonte's form requires FDEP asbestos notification but tells applicants to contact Orange County (407-836-1400, EPD@ocfl.net). FDEP Notice of Renovation or Demolition (Form 62-257.900(1)) at least 10 working days before demolition for buildings subject to the asbestos NESHAP; isolated residential buildings of four or fewer units are generally exempt unless part of a larger project or used commercially. FDEP Central District: 407-897-4100. see the Florida rules on our residential demolition page.
Can Brightview handle the demolition in Altamonte Springs?
Yes. Brightview Homes (CRC1334100) pulls the permit under its Florida contractor license and runs the asbestos survey and notice, utility disconnects, historic documentation when it applies, tear-down, haul-off and final inspection. Demolition is quoted per job, typically $12,000 to $24,000.
Where this comes from
Every fact on this page comes from the official sources below, read on the date shown. Rules change; the building department has the final word.
- Demolition / Building Relocation Permit Application rev. 05/04/2020
https://www.altamonte.org/DocumentCenter/View/26/Demolition-Building-Relocation-Permit-Application - https://library.municode.com/fl/altamonte_springs/codes/code_of_ordinances
https://library.municode.com/fl/altamonte_springs/codes/code_of_ordinances
What we could not confirm in published sources
Ask the building department about these before you plan around them.
- Contradiction: the form directs asbestos questions to Orange County EPD, but Altamonte Springs is in Seminole County, which FDEP lists under the Central District, not a local program.
- Who may apply, current fee schedule, review time.
- Form dated 2020; confirm current version.
Get this scope quoted in Seminole County
Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.
Prefer Spanish? Our team works with you in English or Spanish, from the county board to the permit counter.
- Residential Demolition
