Demolition permit guide · Brevard County

How to demolish a house in Cocoa Beach, FL

In Cocoa Beach, residential demolition permits are issued by the City of Cocoa Beach Chief Building Official (application: City building permit for demolition (LDC Sec. 4-10.A.1)).

Verified 2026-10-12 from 9 official sources
Residential lot
CRC13341008 Central Florida counties480 N Orlando Ave, Suite 236, Winter Park, FL 32789(407) 543-1739
The process

Demolition permit steps in Cocoa Beach

  1. Step 1

    Determine whether the parcel is seaward of the FDEP Coastal Construction Control Line and get any FDEP permit or exemption first; LDC Sec. 4-10.D says all state permitting and licensing requirements must be approved before a city building permit.

  2. Step 2

    Apply through OpenGov with the application, fees, any required site plans or surveys, and copies of state and county permits (LDC Sec. 4-11.B).

  3. Step 3

    Do not start work until the permit is issued (LDC Sec. 4-11.A).

  4. Step 4

    The permit is complete only after final inspection and sign off by the CBO (LDC Sec. 4-13.B).

What to submit

Documents Cocoa Beach asks for

DocumentWhat it is
Copies of state and county required permits or documentationLDC Sec. 4-11.B [2]
Before the machine shows up

Utilities, asbestos, septic and trees in Cocoa Beach

Asbestos

Florida Department of Environmental Protection, Central District (no delegated local program): No local asbestos program covers this county; FDEP Central District (main line 407-897-4100) receives the Notice of Renovation or Demolition (DEP Form 62-257.900(1), Notice of Demolition or Asbestos Renovation) at least 10 working days before the project start date for projects removing asbestos above the NESHAP thresholds. FDEP lists a $200 flat fee for hard copy or Pay Later notices and a $100 fee when paid through the DEP Business Portal Pay Now feature (effective March 23, 2025). FDEP says buildings meeting the residential exemption criteria in the Asbestos NESHAP are excluded from the work practice requirements; check 40 CFR Part 61 Subpart M for whether a given house qualifies. [4]

Septic and well

Florida Department of Health in Brevard County (Environmental Public Health); FDEP rules for the Indian River Lagoon: Septic permitting in Brevard is still handled by the county health department (FDEP list of counties). Florida Department of Health in Brevard County, Environmental Public Health Services, charges $70 for an abandonment. Its repair and abandonment packet asks for a complete application, a written legal description, four copies of a site plan signed and dated by the owner or authorized agent, owner authorization if the applicant is not the owner, and a copy of the warranty deed if recently purchased. Applications may be emailed as PDFs to Brevard.SepticApplication@FLHealth.gov. Office: 2725 Judge Fran Jamieson Way, Suite A116, Viera, FL 32940, phone 321-633-2100, hours Monday to Friday 8:00am to 4:30pm (packet Rev 08/26). Indian River Lagoon note: Brevard is in the FDEP Indian River Lagoon Protection Program area; since January 1, 2024 new septic systems on lots of all sizes there must be nitrogen reducing (ENR-OSTDS), and by July 1, 2030 existing systems must connect to sewer if available or upgrade to at least 65 percent nitrogen reduction. Whether rebuilding after a demolition counts as a new system permit is not stated (FDEP points to DCEH 19-004). [9]

Trees

LDC Sec. 4-10.A.2 also requires a city permit for land clearing, dredging or filling of a site. [2]

After the house is down
  • Final inspection and sign off by the Chief Building Official (LDC Sec. 4-13.B). Permits are valid six months from issuance or the latest approved inspection (LDC Sec. 4-12.A).
Good to know
  • Coastal: FDEP says activities seaward of the CCCL need an FDEP field or administrative permit unless exempt under Chapter 62B-33, F.A.C.; the CCCL is not a line of prohibition. FDEP CCCL program: CCCL@dep.state.fl.us, 850-245-8336.
  • LDC Sec. 4-10.A.5 separately requires a city permit for seawalls, docks and dune walkovers.
Where to file

The office that issues it

City of Cocoa Beach Development Services, Building Division

2 S. Orlando Ave, Cocoa Beach, FL 32932

321-868-3217

Department website

OpenGov

Demolition application

Who may apply: The city says property owners are ultimately responsible for obtaining building permits.

Florida rules

State rules apply on top of the local ones

The asbestos notice, septic and well abandonment, owner-builder limits and the Notice of Commencement come from state law. See the Florida rules that apply to every demolition.

Questions people actually ask

Straight answers

Do I need a permit to demolish a house in Cocoa Beach?

Yes. Residential demolition in Cocoa Beach is permitted through the City of Cocoa Beach Chief Building Official.

Who can pull a demolition permit in Cocoa Beach?

The city says property owners are ultimately responsible for obtaining building permits.

Do I need an asbestos survey to demolish a house in Cocoa Beach?

No local asbestos program covers this county; FDEP Central District (main line 407-897-4100) receives the Notice of Renovation or Demolition (DEP Form 62-257.900(1), Notice of Demolition or Asbestos Renovation) at least 10 working days before the project start date for projects removing asbestos above the NESHAP thresholds. FDEP lists a $200 flat fee for hard copy or Pay Later notices and a $100 fee when paid through the DEP Business Portal Pay Now feature (effective March 23, 2025). FDEP says buildings meeting the residential exemption criteria in the Asbestos NESHAP are excluded from the work practice requirements; check 40 CFR Part 61 Subpart M for whether a given house qualifies.

Can Brightview handle the demolition in Cocoa Beach?

Yes. Brightview Homes (CRC1334100) pulls the permit under its Florida contractor license and runs the asbestos survey and notice, utility disconnects, historic documentation when it applies, tear-down, haul-off and final inspection. Demolition is quoted per job, typically $12,000 to $24,000.

Sources · verified 2026-10-12

Where this comes from

Every fact on this page comes from the official sources below, read on the date shown. Rules change; the building department has the final word.

  1. Cocoa Beach Building Division
    https://www.cityofcocoabeach.com/136/Building
  2. Cocoa Beach LDC Chapter IV, Article II (Ord. 1649, 2020)
    https://cityofcocoabeach.com/DocumentCenter/View/6000/LDC---Chapter-IV--Article-II-Building-Permit-Application-Procedures
  3. FDEP Frequently Asked Questions About the CCCL (updated April 2020)
    https://floridadep.gov/sites/default/files/CCCL-FrequentlyAskedQuestions-2020.pdf
  4. FDEP Asbestos program page (Central District coverage, 10 working day notice, fees)
    https://floridadep.gov/air/permitting-compliance/content/asbestos
  5. FDEP Onsite Sewage FAQ, Permitting (which counties DOH still permits)
    https://floridadep.gov/water/onsite-sewage/content/onsite-sewage-faq-permitting
  6. DOH Brevard OSTDS Application Packet for Repair Permits and Abandonments (Rev 08/26)
    https://brevard.floridahealth.gov/wp-content/uploads/sites/8/2025/04/repairs-and-tank-abandonments.pdf
  7. FDEP Permitting of ENR-OSTDS, Indian River Lagoon Protection Program
    https://floridadep.gov/water/onsite-sewage/content/permitting-enhanced-nutrient-reducing-onsite-sewage-treatment-and
  8. https://cocoabeachfl.viewpointcloud.com/
    https://cocoabeachfl.viewpointcloud.com/
  9. https://brevard.floridahealth.gov/wp-content/uploads/sites/8/2025/04/repairs-and-tank-abandonments.pdf ; https://floridadep.gov/water/onsite-sewage/content/onsite-sewage-faq-permitting ; https://floridadep.gov/water/onsite-sewage/content/permitting-enhanced-nutrient-reducing-onsite-sewage-treatment-and
    https://brevard.floridahealth.gov/wp-content/uploads/sites/8/2025/04/repairs-and-tank-abandonments.pdf ; https://floridadep.gov/water/onsite-sewage/content/onsite-sewage-faq-permitting ; https://floridadep.gov/water/onsite-sewage/content/permitting-enhanced-nutrient-reducing-onsite-sewage-treatment-and

What we could not confirm in published sources

Ask the building department about these before you plan around them.

  • Whether demolition alone seaward of the CCCL requires an FDEP permit, an exemption determination, or nothing.
  • Demolition permit fee (Service Fee Schedule not read) and demolition submittal checklist.
  • Utility disconnect requirements (Cocoa water, Cocoa Beach Water Reclamation, FPL) before demolition.
  • Whether Cocoa Beach has any local historic preservation program.
Start here

Get this scope quoted in Brevard County

Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.

Prefer Spanish? Our team works with you in English or Spanish, from the county board to the permit counter.

Selected scope
  • Residential Demolition
What is the plan? *