Lake County, Florida · On-Site Feasibility Study

Comprehensive On-Site Feasibility Study in Lake County, FL

The desktop audit plus boots on the ground: right of way, culverts, power and water tie-ins checked in person. We handle the Lake County side, from Clermont to Minneola, with the Lake County Office of Planning & Zoning and the city offices where the parcel sits inside city limits.

$1,2505 to 10 business days
★ Lake County specifics

What matters for this in Lake County

Lake County sits on karst: limestone under sandy soil, with sinkhole history in places, which matters for foundations and stormwater. The Green Swamp Area of Critical State Concern covers the south of the county, and the Wekiva area reaches into the east. Outside the cities most lots depend on well and septic, so soils decide what can be built.

Lot splits in unincorporated Lake are reviewed by the Office of Planning & Zoning against the future land use density and the zoning minimums. Septic setbacks and well separation often decide whether a split lot is actually buildable.

Start with a free property snapshot if you want the jurisdiction and flood zone first.

Planning & zoning

Lake County Office of Planning & Zoning

Building permits

Lake County Building Services (cities issue their own)

Water management

St. Johns River Water Management District (SJRWMD); Southwest Florida Water Management District (SWFWMD) in the south and west

Water & sewer

City systems in Clermont, Leesburg, Groveland, Eustis, Mount Dora and Tavares; much of the unincorporated county is on well and septic

★ What's included

Scope

  • Everything in the Desktop Due Diligence Audit
  • Physical right-of-way inspection
  • Ditch and culvert assessment
  • Overhead and underground power connection distance check
  • Neighboring water and sewer tie-in verification
  • Access management review

You receive: A feasibility report with field photos, utility distances, access findings and the site-work items that will drive your budget.

★ Build your scope

Pick your add-ons, see the number

On-Site Feasibility Study$1,250
Recommended add-ons
100%Credited

100% fee credit toward construction

When you build your home, ADU or garage with Brightview Homes, every dollar you paid Brightview for due diligence, entitlements and demolition coordination is credited back against your construction agreement. Pre-construction fees are credited in full against the construction contract price at signing.

  1. Applies to full-cycle building agreements (a home on your lot or custom home, a turnkey ADU, or a custom detached multi-car garage or workshop) with a contract value of $100,000 or more.
  2. Fees are earned as each filing, audit or field visit is completed and are not refundable. The credit is applied against the final construction draw or the pre-construction contract balance, never paid out in cash.
  3. Credits stay valid for 12 months from delivery of the completed work or permit closeout.

The credit covers Brightview's fees. Surveyor, engineer, attorney and government fees are paid directly to those providers and are not part of the credit.

★ Questions people actually ask

Straight answers

How much does an On-Site Feasibility Study cost in Lake County?+

Brightview's fee is $1,250. Prices shown are Brightview's fee. Surveyor, engineer, attorney and government fees are quoted in writing before anything is ordered and paid by you directly to the provider, never marked up. If you go on to build with us, Brightview's fee is credited toward the construction agreement under the build-credit terms.

Who approves an On-Site Feasibility Study in Lake County?+

The answers come from Lake County Office of Planning & Zoning, FEMA flood maps, the National Wetlands Inventory and the utility providers (city systems in Clermont, Leesburg, Groveland, Eustis, Mount Dora and Tavares; much of the unincorporated county is on well and septic). We confirm the key items with the county in writing.

How long does it take in Lake County?+

5 to 10 business days. The proposal gives a schedule for your parcel before you commit.

Is any of this free?+

The property snapshot is free because it only reads public records. Every service on this menu is a paid, defined scope, and Brightview's fees are credited toward the construction agreement if you build with us.

★ Start here

Get this scope quoted in Lake County

Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.

Prefer Spanish? Our team works with you in English or Spanish, from the county board to the permit counter.

Selected scope
  • On-Site Feasibility Study
What is the plan? *