How to demolish a house in Leesburg, FL
In Leesburg, residential demolition permits are issued by the City of Leesburg Building Division (application: Demolition Application and Affidavit (Affidavit of Requirements for Demolition of Structures, plus Owner's Affidavit for Demolition of Structures), with the building permit application). If the house is a designated landmark or sits in a local historic district, review by the Historic Preservation Board comes first.

Demolition permit steps in Leesburg
Step 1
Notify all utility companies (power, gas, telephone) of the intent to demolish.
Step 2
If the structure has City of Leesburg electric service, get the demolition permit, then call Leesburg Customer Service at 352-728-9800 to order removal of the electric meter and service. Do not remove the meter yourself. Crew dispatch can take up to 96 hours or more.
Step 3
Remove and seal any solar, generator, water, gas or septic connections per the Florida Building Code and local ordinances.
Step 4
Submit the building permit application, notarized demolition affidavit, owner's affidavit(s), proof of ownership, asbestos acknowledgement, and plot plan.
Step 5
Pass the pre-demolition inspection verifying utilities are disconnected.
Step 6
Demolish, take debris to the appropriate Solid Waste drop off site in Leesburg/Lake County, and post the receipts on the job site.
Step 7
Pass the final inspection after all debris is removed.
Documents Leesburg asks for
| Document | What it is |
|---|---|
| Building permit application form | Listed on the demolition affidavit. [3] |
| Demolition / Owner's affidavit (signed and notarized) | All owners listed on the property must sign an Owner's Affidavit. [3] |
| Proof of ownership | Tax receipt, property record card or warranty deed. [3] |
| Asbestos Acknowledgement | Building Department Asbestos Acknowledgement and Notification Statement (created 06/10/2025); applicant acknowledges receipt of the DEP Notification of Renovation or Demolition form. [4] |
| Plot plan | Showing all structures, septic tank and well, with the structure to be demolished identified. [3] |
If the house is historic in Leesburg
Who reviews it: Historic Preservation Board.
When it applies
- Property in the Downtown Historic District (approved by voters May 2003, about 105 acres and over 300 parcels; boundary described on the city's Historic Preservation page).
How the review works
- The Historic Preservation Board works with the Planning Division on design standards for properties requesting alterations, construction, demolition, relocation or removal in the Historic District.
- Historic applications are due by 4:00 PM on the first working day of the month; the board meets at 4:30 PM in City Hall commission chambers.
- Fees: Historic Application Review (Staff) $50; Historic Application Review (HPB) $120.
- Example: November 5, 2025 HPB agenda heard case HP-25-725, 404 W Main Street, partial demolition and renovations.
Utilities, asbestos, septic and trees in Leesburg
The office that issues it
State rules apply on top of the local ones
The asbestos notice, septic and well abandonment, owner-builder limits and the Notice of Commencement come from state law. See the Florida rules that apply to every demolition.
Straight answers
Do I need a permit to demolish a house in Leesburg?
Yes. Residential demolition in Leesburg is permitted through the City of Leesburg Building Division.
Who can pull a demolition permit in Leesburg?
Signature of the person responsible for demolition, with license number if applicable. All owners listed on the property must sign an Owner's Affidavit. An Owner Builder Statement form is on the city forms page.
What if my house is historic in Leesburg?
If the house is a local landmark or in a local historic district, Historic Preservation Board reviews the demolition before a permit can issue.
Do I need an asbestos survey to demolish a house in Leesburg?
Asbestos acknowledgement required with the permit; quotes FBC 105.9 and F.S. 469.003. If asbestos is found, the Building Department must be notified and Chapter 469, F.S. followed.
Can Brightview handle the demolition in Leesburg?
Yes. Brightview Homes (CRC1334100) pulls the permit under its Florida contractor license and runs the asbestos survey and notice, utility disconnects, historic documentation when it applies, tear-down, haul-off and final inspection. Demolition is quoted per job, typically $12,000 to $24,000.
Where this comes from
Every fact on this page comes from the official sources below, read on the date shown. Rules change; the building department has the final word.
- Leesburg Building Department
https://www.leesburgflorida.gov/my_city/departments/building/index.php - Leesburg Forms
https://www.leesburgflorida.gov/services/forms.php - Demolition Application and Affidavit (rev. Sept 16, 2019)
https://www.leesburgflorida.gov/document_center/Building/Demolition%20of%20structureR.pdf?t=202401251442010 - Asbestos Acknowledgement and Notification Statement (2025)
https://leesburgflorida.gov/document_center/Building/Asbestos%20Statement%20and%20DEP%20Notification%20forms.pdf?t=202506171518090 - Leesburg Electric: New construction/upgrade
https://www.leesburgflorida.gov/services/electric/new_construction_upgrades.php - Leesburg Historic Preservation
https://leesburgflorida.gov/my_city/departments/pnz/historic_preservation.php - Leesburg Planning and Zoning
https://www.leesburgflorida.gov/my_city/departments/pnz/index.php - Leesburg Planning Application Fees
https://leesburgflorida.gov/my_city/departments/pnz/fees.php - https://www.leesburgflorida.gov/my_city/boardsandcommittees.php
https://www.leesburgflorida.gov/my_city/boardsandcommittees.php - https://www.leesburgflorida.gov/2025%2011%2005%20-%20Agenda%20-%20Historic%20Preservation%20Meeting.pdf?t=202510220714160
https://www.leesburgflorida.gov/2025%2011%2005%20-%20Agenda%20-%20Historic%20Preservation%20Meeting.pdf?t=202510220714160 - https://cdpservices.leesburgflorida.gov/prod/oprs_pt/
https://cdpservices.leesburgflorida.gov/prod/oprs_pt/
What we could not confirm in published sources
Ask the building department about these before you plan around them.
- the city code is on Municode, which could not be retrieved.
- Demolition building permit fee not found.
- Conflicting HPB meeting day: Historic Preservation page says last Wednesday of the month; Planning and Zoning page says fourth Wednesday.
- Conflicting Building Division address and phone between the web page (501 W. Meadow St., 352-728-9700) and the 2025 asbestos form (204 N. 5th St., 352-728-9735). The Electric page lists 352-728-9750 for Building Department demolition permits.
Get this scope quoted in Lake County
Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.
Prefer Spanish? Our team works with you in English or Spanish, from the county board to the permit counter.
- Residential Demolition
